YVR Glycol Buildings

Description: Two Glycol Storage Buildings totaling 26,400 sq. ft. for the Aeromag De-icing Truck fleet.

Location: Richmond, BC

Vancouver Airport Authority

Description: A design-build 35,000 sq. ft. office complex to be completed in January 2015, built in a collaborative approach with the  owner and our design-build team. The building houses 5 Airport Authority departments consisting of Engineering Projects, Engineering Services, Environment, YVR Project Management Ltd. and the Maintenance Transition Team. The space consists of offices, meeting rooms, large open workstation spaces, lunch room, washrooms and storage/copy/library rooms.  The building construction consists of a concrete raft slab foundation, pre-engineered building, efficient HVAC system with VAV's for every space, LED lighting and high end commercial finishes, will be completed on an aggressive eight month schedule and on budget.

Location: Vancouver, BC

YVR Temporary Terminal Building - Olympics

Description: The full construction and fit-out of this 46,000 sq. ft. remote terminal facility was completed within 120 days for the 2010 Winter Olympics.

Location: Vancouver, BC

Shell Aerocentre - Victoria

Description: A 90,000 sq. ft. Flight Centre including a two-storey flight base operators office facility and three hangars.

Location:  Victoria, BC

Shell Aerocentre - Vancouver

Description: A 95,000 sq. ft. Vancouver Flight Centre including a 20,000 sq. ft. three storey office building and 75,000 sq. ft. five aircraft hangar facility.

Location: Vancouver, BC

Phoenix Heliflights

Description: A 7,000 sq. ft. helicopter hangar facility complete with offices. Completed 2001. A 19,000 sq. ft. helicopter maintenance facility with 2nd floor. Completed 2011

Location: Fort McMurray, AB

Fort McMurray Airport

Description: A 4,600 sq. ft. addition to the passenger hold room and baggage areas, with associated renovation and upgrades to existing main terminal. Completed 2004.

Location: Fort McMurray, AB